If you need to obtain permits for a building project, using a building permit expeditor can save you both time and money. Furthermore, a permit expeditor will know which types of permits are required for each type of construction. Since you may need permits from different offices, using permit expediting services can streamline this process…. View Article The post A Brief Overview of The Building Permit Process appeared first on Scout Services.

I

f you need to obtain permits for a building project, using a building permit expeditor can save you both time and money. Furthermore, a permit expeditor will know which types of permits are required for each type of construction. Since you may need permits from different offices, using permit expediting services can streamline this process.

While permit costs will vary, they tend to range from approximately $100 to $1,000 or higher. The cost of a permit will depend on several factors, including the location, size, and type of project. To obtain a permit, contractors usually pay between $200 and $400. The cost for filing a project, however, can range between $1,500 and $3,500.

To begin the new construction permit process in Boston, for example, an online permit application needs to be completed, according to Boston.gov. After this, the relevant parties need to make an appointment to provide specific information about the project. Whether it’s a major project such as a new-home construction, or a minor project such as the installation of solar energy panels, the required information will be relevant to the project.

During this initial appointment, details on the space requirements, the amount of work, and overall costs need to be provided. In addition, the City of Boston will also require copies of the building plans and other documents. These plans and documents need to be stamped by a licensed professional.

The next step in the process is to attend a zoning and building review. Each review will require additional documents. For the zoning review, these documents include but aren’t limited to illustrated plot and elevation plans. The building review will require electrical, HVAC, plumbing, and alarm system plans, along with other essential documents, such as contractor licenses.

If a project entails any demolition, Boston.gov indicates that additional permits are needed. Depending on what is being demolished and where it is located, permissions may need to be obtained from the Landmarks Commission and the Fire Department. When hazardous materials are involved, permits from the Department of Environmental Protection would be required.

Whether you need a residential building permit, an electrical permit, a solar permit, or other types of permit services, please contact our office today to learn more about how we can assist you.